A permanent on-site generator has the capacity to run critical equipment in case of power failure, however it does not have the capacity to maintain the power requirements for the entire building. Originally, a one square metre mimic panel was to be installed for auto/off manual control, run/fault indication, monitoring of generator current and chiller demand adjustment. If the total demand during a power failure increases to the generator's upper limit, the operator has the facility to:
This website uses cookies to improve user experience. By using our website you consent to all cookies in accordance with our Privacy Policy.